The recommended TIA format is as follows:
-
Executive Summary
- Table summarizing significant impacts and mitigation measures.
-
Introduction
- Purpose of the TIA and study objective.
- Project location and vicinity map (Exhibit).
- Project size and description.
- Existing and proposed land use and zoning.
- Site plan and proposed project (Exhibit).
- Proposed project opening year and analysis scenarios.
-
Methodology and Impact Thresholds
-
Existing Conditions
- Existing roadway network.
- Existing traffic control and intersection geometrics (Exhibit).
- Existing traffic volumes – AM and PM peak hour and ADT (Exhibit).
- Existing level of service (LOS) at intersections (Table).
- Existing bicycle facilities (Exhibit).
- Existing transit facilities (Exhibit).
- Existing pedestrian facilities.
-
Project Traffic
- Trip generation (Table).
- Trip distribution and assignment (Exhibit).
- Project peak hour turning movements and ADT (Exhibit).
-
Background Conditions (Opening Year) Analysis
- No Project analysis:
- Committed (funded) roadway improvements.
- Approved project trip generation (Table, if required).
- Approved project trip assignment and distribution (Exhibit, if required).
- Peak turning movement and ADT (Exhibit).
- Intersection level of service (Table).
- Roadway segment level of service (Table).
- Plus Project analysis:
- Plus Project peak turning movement and ADT (Exhibit).
- Intersection level of service (Table).
- Roadway segment level of service (Table).
- Identification of intersection and roadway segment deficiencies.
- No Project analysis:
-
Cumulative Year Analysis
- No Project analysis:
- Committed (funded) roadway improvements.
- Pending projects and verification of how they are included in the travel demand forecasting model.
- Cumulative Year peak turning movement and ADT (Exhibit).
- Intersection level of service (Table).
- Roadway segment level of service (Table).
- Plus Project Analysis:
- Plus Project peak turning movement and ADT (Exhibit).
- Intersection level of service (Table).
- Roadway segment level of service (Table).
- Identification of intersection and roadway segment deficiencies.
- No Project analysis:
-
Traffic Signal Warrant Analysis
-
Site Access Analysis
-
Safety and Operation Improvement Analysis
-
Active Transportation and Public Transit Analysis
-
Improvements and Recommendations
- Proposed improvements at intersections.
- Proposed improvements at roadway segments.
- Recommended improvements categorized by whether they are included in the fee plan or not. (Identify if these improvements are included in an adopted fee program).
-
Vehicle Miles Traveled (VMT) Analysis
- Project VMT per person/employee for all analysis scenarios.
- Project effect on VMT for all analysis scenarios.
- Identification of VMT impacts.
- Proposed VMT Mitigation Measures.
-
Appendix
- Approved scope of work.
- Traffic counts.
- Intersection analysis worksheets.
- VMT and TDM calculations.
- VMT and TDM mitigation calculations.
- Signal warrant worksheets.