Traffic Control Plan in Chula Vista

Traffic Control Plan in Chula Vista

A Traffic Control Plan (TCP) in Chula Vista, also called a traffic control plan, construction traffic control plan, work zone traffic control plan, traffic control plan, or temporary work zone traffic control plan consists of well-planned written instructions and often accurately designed engineered drawings. Traffic Control Plans are used to construct a project on a highway while guiding and protecting traffic passing through or around a construction work zone.

The primary function of a construction traffic control plan is to provide safe and efficient movement of the traveling public in Chula Vista through or around work zones while protecting on-site workers, incident responders, and equipment. A temporary work zone traffic control plan in Chula Vista must provide efficient construction and maintenance of the highway. The needs, control, and safety of vehicular traffic, bicyclists, and pedestrians through a traffic control plan are essential to a well-designed traffic control plan.

Therefore, the four primary functions of a traffic control plan are to provide:

  • Enhanced Safety
  • Minimized Inconvenience
  • Efficient Traffic Flow
  • Adequate Mobility for All Road Users

Planning a traffic control plan in Chula Vista should start as early as possible, preferably in the project planning and development phase. This is especially true for larger, significant, and more complex projects. A well-designed temporary work zone traffic control plan in Chula Vista must consider various staging options for the work zone traffic control plan, including options where the separation between workers and the traveling public can be maximized.

At AHTC, our traffic engineers regularly communicate with the project team members and use all available resources when optimizing the temporary work zone traffic control plan, particularly with the resident engineer’s staff and the contractor, to address constructability issues.

What Do Traffic Control Plans Include?

A construction traffic control plan in Chula Vista should include project-specific instructions sheet(s). The plan sheets are used as a graphical representation of the construction area’s traffic control plan. The instruction sheets provide the contractor with additional information and instructions showing how to set up and stage the construction work zone area in Chula Vista for a project while providing safe and efficient passage for live traffic.

For smaller projects in Chula Vista that do not need staging, the project may be constructed without the need for involved stages and detours. Therefore, they may not need a temporary work zone traffic control plan.

What factors are used in developing a construction traffic control plan in Chula Vista?

The following are specific factors that can influence the design of a temporary work zone traffic control plan:

  • Traffic data obtained in Chula Vista – Existing traffic volumes, roadway capacity, 85th percentile speeds, truck traffic volume, crash history, and problem areas within the project limits.
  • The highway characteristics – Horizontal and vertical alignments, number of traffic lanes, lane and shoulder widths, pavement types and conditions, sight distances, surrounding terrain, and local environs (e.g., urban, rural, commercial, residential, etc.).
  • Traffic control devices – Signs, striping, structures, traffic signals, roadside barriers, pavement markings, lighting, and other traffic control devices.
  • Construction details and timing – Materials used for the finished product, excavation quantities and locations, project durations, available right of way and work area separation from traffic, and the number of accesses adjacent to work areas.

A work zone traffic control plan in Chula Vista is designed and typically arranged as follows:

  • Cover Sheet(s) – Include instructions and information for construction activities, customized temporary signs, and other unique devices and products.
  • Plan and Detour Sheet(s) – Display construction staging drawings identifying the portions of the work area in Chula Vista used by live traffic and those available to the contractor for construction. Include details for the location, type, and quantity of traffic control devices required to guide and protect traffic through the work zone. Display designated route(s) for traffic to circumvent the work zone using existing alternate routes in Chula Vista. Include details for points of closure, detour-specific signing, devices, and other detour route conditions, restrictions, and information.

If you need a temporary work zone traffic control plan in Chula Vista, please give us a call here at AHTC for the best and most efficient service at the most competitive rates.

We service the entire Chula Vista area in San Diego County, including the following zip code(s):

91909, 91910, 91911, 91912, 91913, 91914, 91915, 91921