Serving clients in Arizona, California, Colorado, Hawaii, Iowa, Missouri, Nevada, New Jersey, New Maxico, Oregon, Tennessee, Texas, Utah, Washington .
(818) 697-6626
Services

Screening Criteria for Transportation Projects under the California Environmental Quality Act Transportation Impact Analysis Process in Los Angeles County

 Los Angeles County Traffic Study Guidelines  Section 3.2.2. - Screening Criteria

If the answer to the following question is no, further analysis is not required, and a less-than-significant impact determination can be made for that threshold: Would the project include the addition of through traffic lanes on existing or new highways, including general-purpose lanes, high-occupancy vehicle (HOV) lanes, peak period lanes, auxiliary lanes, and lanes through grade-separated interchanges (except managed lanes, transit lanes, and auxiliary lanes of less than one mile in length designed to improve roadway safety)?

Transit and active transportation projects, as well as projects that reduce roadway capacity, generally reduce VMT and are presumed to cause a less-than-significant impact. Transportation projects that are unlikely to result in a substantial or measurable increase in vehicle travel, and therefore do not require an induced travel analysis supported by the OPR technical advisory, include:

  • Rehabilitation, maintenance, replacement, safety, and repair projects designed to improve the condition of existing transportation assets (e.g., highways, roadways, bridges, culverts, Transportation Management System field elements such as cameras, message signs, detection, or signals, tunnels, transit systems, and assets that serve bicycle and pedestrian facilities) without adding motor vehicle capacity
  • Installation of roadside safety devices or hardware such as median barriers and guardrails
  • Roadway shoulder enhancements to provide "breakdown space" for transit vehicles, bicycle access, or improved safety without using the space as automobile travel lanes
  • Addition of an auxiliary lane of less than one mile in length designed to improve roadway safety
  • Installation, removal, or reconfiguration of traffic lanes that are not for through traffic, such as left, right, and U-turn pockets, two-way left turn lanes, or emergency breakdown lanes not utilized as through lanes
  • Addition of roadway capacity on local or collector streets that substantially improves conditions for pedestrians, cyclists, and, if applicable, transit
  • Conversion of existing general-purpose lanes (including ramps) to managed lanes or transit lanes, or changing lane management in a manner that would not substantially increase vehicle travel
  • Addition of a new lane permanently restricted to use by transit vehicles
  • Reduction in the number of through lanes
  • Grade separation to separate vehicles from rail, transit, pedestrians, or bicycles, or to replace a lane to separate preferential vehicles (e.g., HOV, HOT, or trucks) from general vehicles
  • Installation, removal, or reconfiguration of traffic control devices
  • Installation of traffic metering systems, detection systems, cameras, changeable message signs, and other electronics designed to optimize vehicle, bicycle, or pedestrian flow
  • Timing of signals to optimize vehicle, bicycle, or pedestrian flow
  • Installation of roundabouts or traffic circles
  • Installation or reconfiguration of traffic calming devices
  • Adoption of or increase in tolls
  • Addition of tolled lanes where tolls are sufficient to mitigate VMT increase
  • Initiation of new transit service
  • Conversion of streets from one-way to two-way operation with no net increase in traffic lanes
  • Removal or relocation of off-street or on-street parking spaces
  • Adoption or modification of on-street parking or loading restrictions (including meters, time limits, accessible spaces, and preferential/reserved parking permit programs)
  • Addition of traffic wayfinding signage
  • Rehabilitation and maintenance projects that do not add motor vehicle capacity
  • Addition of new or enhanced bike or pedestrian facilities on existing streets/highways or within existing public rights-of-way
  • Addition of Class I bike paths, trails, multi-use paths, or other off-road facilities that serve non-motorized travel
  • Installation of publicly available alternative fuel/charging infrastructure
  • Adding passing lanes, truck climbing lanes, or truck brake-check lanes in rural areas that do not increase overall vehicle capacity along the corridor

Our Services are available throughout Los Angeles County including  90031, 90032,  90033

Serving Both Public and Private Sector Clients

Based in Los Angeles California, our firm provides comprehensive transportation consulting services from conceptual planning onward, with the goal of delivering efficient, high-quality creative solutions and seeing them through to the completion of projects. We have skilled traffic engineers and transportation planners to undertake a variety of projects with confidence while meeting the needs of a diverse clientele.