Los Angeles County Traffic Study Guidelines Section 4.1.5. – Recommended Action
Potential corrective actions for project access and circulation constraints can include, but are not limited to:
- Installation of a traffic signal or stop signs or electronic warning devices at site access points,
- Redesign and/or relocation of project access points,
- Redesign of the internal access and circulation system,
- Installation of stop-signs and pavement markings internal to the site,
- Restriction or prohibition of turns at site access points,
- Installation of new traffic signal, left-turn signal phasing, or other vehicle flow enhancements at nearby intersections,
- Reconfiguration of study intersections that reduces gridlock and unsafe conflict points.
Any of the above-mentioned actions shall be recommended in accordance with California Manual on Uniform Traffic Control Devices (CA MUTCD) warrants and criteria, or other criteria deemed appropriate by Public Works.
Our Services are available throughout Los Angeles County including 90055, 90056, 90057