Los Angeles County Traffic Study Guidelines Section 3.2.3. – Impact Criteria
The project has a potentially significant VMT impact if it meets the criteria listed below. The impact criteria below are considered as a potential option that may be selected as thresholds for determining significance. The impact criteria below is based on guidance published by OPR2, but their applicability to a specific project shall be justified with substantial evidence and is not presumed to be appropriate.
- The project will increase the project area VMT, as measurable by the SCAG RTP/SCS base year Travel Demand Forecasting Model plus an induced travel elasticity factor per lane mile.
Our Services are available throughout Los Angeles County including 90034,90035,90036