Serving clients in Arizona, California, Colorado, Hawaii, Iowa, Missouri, Nevada, New Jersey, New Maxico, Oregon, Tennessee, Texas, Utah, Washington .
(818) 697-6626
Services

Categories of Transportation Impact Studies for the project in San Bernardino

The categories of Transportation Impact Study (TIS) required should be determined based on the project’s location, the number of trips generated, the estimated Vehicle Miles Traveled (VMT), and whether the project falls within a fee plan area. The Traffic Division will determine the appropriate study type for the applicant. There are two types of TIS that may be requested by the Department of Public Works:

  1. Transportation Impact Study (TIS): This comprehensive study is required when specific thresholds are met, as outlined in the recommendations. These recommendations align with SBCTA guidelines, so a TIS required by the County may also fulfill the requirements for a TIS under the SBCTA Congestion Management Program.

  2. Letter Report: This concise report addresses significant impacts of the project in the immediate area. It is primarily intended for specific concerns or small projects and is limited to special situations. Letter reports may suffice for documenting potential VMT impacts, recommending mitigation measures to reduce VMT, or addressing a limited number of study locations.

Our Services are available throughout San Bernardino including cities Colton,Fontana with Zipcodes 92324, 92331, 92334

Serving Both Public and Private Sector Clients

Based in Los Angeles California, our firm provides comprehensive transportation consulting services from conceptual planning onward, with the goal of delivering efficient, high-quality creative solutions and seeing them through to the completion of projects. We have skilled traffic engineers and transportation planners to undertake a variety of projects with confidence while meeting the needs of a diverse clientele.