But before that, here’s an overview of the physical mitigation measures & corrective conditions. So, are you ready to get an insightful analysis on this front? Well, to start off, preliminary geometric design drawings must be prepared for the proposed physical mitigation measures as well as corrective conditions that comply with the given requirements:

  • Outlining the Existing Conditions

Considering the existing conditions, one should prepare the preliminary geometric design drawing to the scale 1” = 40’ for every significant intersection. But there, the lane reconfigurations should be a proposed corrective condition. One should conduct field investigations & illustrate the important roadway details. That includes adjacent land use, sidewalks, parking restrictions, lane dimensions, driveways, curb & right-of-way lines, “footprints” of the plan’s building line, and roadway striping.

One should also use the existing drawings where available. Remember, field check is a necessity for accuracy to reflect the current conditions.
A copy of the recent City Bureau of Engineering District Map that illustrates public rights-of-way on the impacted street.

  • The Forthcoming Conditions with Conditions or Mitigation

The plans that show striping modifications must include adequate roadway segments (around 300 to 400 feet on every intersection’s leg). It indicates the most appropriate transitions from existing striping.

Note that plans must indicate parking restrictions (proposed and existing), bus stops (relocated and existing), signals, driveways, signs, streetlights, utility poles, catchment basins, and trees.

It must include the traffic volume diagram.

One should attach the PM and AM peak hour lane volume diagram with geometric design plans considering every intersection.

It is also important to finalize plans as per your requirements

It is imperative to revise mitigation plans when required before resubmitting your final mitigation plan to the LADOT to get approval.

Outlining the Parking Inventory & Demand Analysis

Note that the corrective condition or a land use development project’s mitigation should involve roadway reconfigurations & loss of on-street parking. The traffic assessment must include the on-street parking utilization study or/and along a roadway where identifications of potential improvements are made. The study results must remain present in the parking inventory & demand analysis, summarizing the parking supply and demand of the area, thereby informing LADOT on secondary impacts.

The analysis must include proposed measures that address neighborhood access constraints due to parking losses to an extent feasible. The parking study, including survey hours and study area, should be approved by the appropriate LADOT staff before beginning your survey.

Evaluating the Parking Meter Revenue Losses

Irrespective of the mitigation, condition, and design of any land use development, the project must permanently remove metered parking spaces. Besides, it needs payment to LADOT for lost parking meter revenue.

Did you know that LADOT’s Parking Meters Division is always responsible for computing the lost revenue fee? It is regarded as the MRRF or Meter Revenue Recovery Fee for every parking meter requested for during the site plan.

Truth be told, LADOT can determine the overall MRRF amount that needs to get collected on the basis of the overall revenue for every meter collected over the past year, i.e., continuously for twelve months.

The fact is that the permanent removal of every on-street metered parking space needs MRRF payment to the Parking Meter Division of LADOT for annual revenue calculated over ten years.

Payment is a necessity for applicants before LADOT provides them with the final approval. The overall project applicant is subject to the costs incurred by LADOT during any parking meter removal. Note that the charges are included but not limited to the installation.

What if the project implementation is associated with the development project and it needs a temporary removal of the on-street parking meter? Then, the project applicants will need to make the payment to LADOT’s parking meter division for the costs of removal in advance.

Such charges include but are not limited to installing or removing meter posts, parking sensors, stall markings, curb paint, and more. LADOT’s parking meter division might demonstrate the lost revenue for temporarily removing parking meters that last over thirty days. Did you know that LADOT determines the overall MRRF amount collected for the temporary removal of every meter on the basis of the overall revenue collected over the past 12 months

The applicant needs to pay a calculated MRRF to LADOT’s on the actual date of removal. When and as applicable, the Parking Meters Division then determines the total loss of revenue for any temporary parking meter removal that lasts over 30 days.

Note that LADOT determines the overall amount of the MRRF collected for the temporary removal of  every meter on the basis of the overall daily revenue average for the revenue collected over the past twelve continuous months. An applicant needs to pay the MRRF collected to the LADOT.

Do you wish to learn further about how to accuratey evaluate the traffic assessment report? Now is the right time to contact Armen Hovanessian Transportation Consulting. The company has in-house traffic engineers who can help you acquire the most accurate traffic assessment report in the city of Los Angeles.

Serving Both Public and Private Sector Clients

Based in Los Angeles California, our firm provides comprehensive transportation consulting services from conceptual planning onward, with the goal of delivering efficient, high-quality creative solutions and seeing them through to the completion of projects. We have skilled traffic engineers and transportation planners to undertake a variety of projects with confidence while meeting the needs of a diverse clientele.